Thinking about a new bathroom? The biggest mistake many homeowners make is not having a solid schedule. Without a plan, you end up with surprise delays, extra costs, and a lot of stress. Below is a practical timeline you can follow, whether you’re doing a small refresh or a full gut‑rebuild.
Start by writing down exactly what you want – new fixtures, tile, lighting, layout changes, etc. Sketch a rough floor plan or use a free online tool. Once you know the scope, talk to your local council about permits. Most bathroom work that touches plumbing or structural walls needs approval, and getting the paperwork done early avoids waiting weeks later.
While you’re waiting for permits, order long‑lead items like bathtubs, vanity units, and custom tile. These can take 2‑4 weeks to arrive, so ordering now keeps the project moving.
Week 1: Demolition. Shut off water and electricity, then remove old fixtures, tiles, and any damaged drywall. Keep the area clean – a tidy site speeds up the next steps.
Week 2: Rough‑in plumbing and electrical. Have a licensed plumber run new supply lines for the shower, tub, and toilet. An electrician should install new wiring for lights, outlets, and any heated flooring.
Week 3: Wall and floor prep. Install moisture‑resistant drywall, apply a primer, and check that all pipes are leak‑free. If you’re using cement board under tile, put it in now.
Week 4: Tile and flooring. Lay floor tile first, then wall tile. Use spacers for consistent grout lines and let the mortar cure as the manufacturer recommends – usually 24‑48 hours.
Week 5: Fixture installation. Hang the vanity, install the toilet, faucet, showerhead, and any accessories. Connect everything to the water supply and test for leaks.
Final week: Finishing touches. Apply caulk around tubs and sinks, install mirrors, towel bars, and lighting. Do a thorough clean, then walk through with your contractor to sign off on any punch‑list items.
Tips to keep the schedule tight:
When the schedule is realistic and you stick to it, the bathroom renovation can finish within a month instead of dragging on for months. Use this timeline as a guide, adapt it to your specific project, and enjoy a fresh bathroom without the chaos.